Services
PCB Assembly & BOM Sourcing in Shenzhen
PCB assembly in China begins with a controlled set of engineering inputs. A board quantity alone is not enough to compare manufacturing offers: fabrication requirements, component sourcing, assembly instructions and test coverage all affect the scope. Our Shenzhen sourcing and coordination service helps organize those supplier conversations around your actual revision. State whether you need bare-board procurement, component purchasing, assembly coordination or a combination. We coordinate the agreed work; this page does not imply that hqbguide.com owns an assembly factory or operates a certification laboratory.
What's included
Start with the current bill of materials, board files, assembly drawings and quantity targets. Identify manufacturer part numbers, approved alternates and parts that must not be substituted. The proposed sourcing scope can cover supplier quote coordination, component availability questions and sample consolidation. For assembly work, specify which supplier responsibilities need coordination and what evidence must be returned for engineering approval. Ask suppliers to flag ambiguous references, missing values and package mismatches before procurement. Treat proposed alternatives as approval requests rather than automatic changes to your design.
Deliverables
Agree a revision-labeled quote comparison and an exceptions list covering unavailable components, proposed substitutions, minimum quantities and lead-time assumptions. A sourcing record should distinguish quoted stock from stock that has actually been reserved or received. For a sample build, define which units, photographs, inspection notes and test results will be delivered. Document the assembly and test scope in language your engineering team can approve. Any unresolved issue should stay visible at handover so a working sample is not mistaken for approval of every production condition.
Timeline and engineering gates
The workflow moves from file review to quotations, component approval, procurement, assembly and agreed checks. Each gate depends on the previous inputs being complete. Component availability and board revisions can change the schedule, so keep design changes under written revision control. [Owner confirmation required: engineering review turnaround, sample-build lead time and production scheduling range.] If a deadline matters, identify which files are frozen and which components are already approved. Ask the quotation to explain whether lead time begins with payment, complete files or material arrival.
Price and purchasing basis
Price: [Owner confirmation required: service starting fee or range and currency, plus the quoting basis for fabrication, parts, assembly and testing.] Request separate line items for service fees, board fabrication, components, setup, assembly and any required fixtures. Confirm treatment of excess components caused by minimum order quantities, freight and applicable taxes. The $99 market orientation is a different service and is not a PCB assembly price. Final pricing needs the board revision, quantity and agreed quality requirements; a sample price should not be extrapolated directly to a production batch.
Anonymized case — awaiting approval
[Owner: insert an approved PCB or BOM sourcing case with the board category, revision, sourcing constraint, actual coordination work and verified outcome. Remove confidential design details and obtain publication permission.] This space does not claim an unverified turnaround, yield improvement or customer result.
Request a service booking
Frequently asked questions
Do you manufacture the boards yourselves?
This is a sourcing and coordination service. The fabrication and assembly suppliers and their responsibilities must be identified in the project scope.
Which files should I prepare?
Prepare your BOM, current board files, assembly drawings, quantity and test requirements. Mark approved alternatives and substitution restrictions.
Can you source unavailable components?
Send exact part numbers and acceptable alternatives for an availability review. Availability and authenticity must be evaluated; supply is not guaranteed.
Are functional tests included?
Functional tests require an agreed procedure, fixtures and acceptance criteria. Include these requirements in the quote request.
How long does a sample build take?
Timing depends on complete files, material availability, supplier scheduling and test scope. Request a dated schedule with the quotation.
How do I request a PCB assembly quote?
Use the form with a non-confidential project summary, board quantity and target date. Arrange a suitable file-sharing process before sending sensitive design files.
Start with market orientation: book a Huaqiangbei tour.